Water Main Replacement Update

Standard

Since Rocky is currently on “restricted activity”, we aren’t taking as long of walks as we were before, so we’re seeing less of the digging and pipe placement as we were before the Christmas break.

However, everything I do see makes me think it won’t be long before they do switch over the pipes.

Several times I’ve driven by someplace where the old and new hydrants are near to each other, and have seen them connected to each other with a fire hose. I’ve also seen water pouring out of various hydrants as workers stood around and watched. Other times, I saw water pouring out of a small wooden box. Both make me think that they’ve been doing pressure tests or leak tests on the new pipes. The new hydrants no longer have the white plate under the side nozzle, which I assumed was meant for any fire fighters to know it wasn’t a working hydrant. Which makes me hope the hydrants are actually working now.

Also, they’ve been digging up spots on the streets where they’ve previously laid the pipe. I’m guessing that they’re doing the final connections, and getting rid of the PVC pipes that they were using as markers (the ones that were still there, and hadn’t been knocked down or otherwise gotten rid of).

Recently I figured out that the construction equipment and pipes I saw in a fenced vacant lot near us was related to the water main replacement. I should have figured it out earlier, of course, but I hardly looked at it when we drove or walked by. It wasn’t until I realized that the six-foot orange pipes I saw lying horizontally had black caps at one end that I knew I was looking at fire hydrants, and then made sense of the rest of it.

If they are going through and connecting the houses to the pipes, then they probably will reach our street today or tomorrow.

I’ll let you know.